MassDOT Sidewalk Repair & Frame Grate Replacement
Posted on: November 28, 2018 - 3:18pm
Please be advised MassDOT (Contractor- LAL Construction) will be doing minor sidewalk repairs, frame & grate replacement at 107 Main Street.
Estimated start of work is November 29, 2018 duration should be 1-2 days
Plans will be em,ployed to regulate the occasional single lane closure as needed.
Attachment | Size |
---|---|
doc112818-002.pdf | 590.55 KB |