MassDOT Sidewalk Repair & Frame Grate Replacement
Please be advised MassDOT (Contractor- LAL Construction) will be doing minor sidewalk repairs, frame & grate replacement at 107 Main Street.
Estimated start of work is November 29, 2018 duration should be 1-2 days
Plans will be em,ployed to regulate the occasional single lane closure as needed.