Acushnet Road Will Be Closing for Bridge Repair
Starting July 12, 2021 for Approximately 1 Month
Posted on: June 28, 2021 - 10:33am
The Town of Mattapoisett and its contractor, Aqua Line Utility Inc., will be replacing the bridge on Acushnet Road. The bridge, located about ¼ mile south of Tinkham Lane, has structural and safety concerns, and will be replaced with a concrete box culvert.
In order to replace the bridge, Acushnet Road is currently scheduled to be closed on or about July 19, 2021 and will be closed for approximately 1 month.
The detour route is the same as proposed last year and a copy is attached for your information. Detour signing has already been installed and is currently covered. The signs will be uncovered when the road is closed.
Attachment | Size |
---|---|
mattapoisett_river_bridge_replacement.pdf | 533.82 KB |